Wireline Encroachments Attorney for Local Governments
Fiber, cable, and telephone infrastructure in your streets creates long-term obligations — and long-term liability if those obligations aren’t enforced.
Explore Our Other Practice Areas:
Wireline Infrastructure, Encroachments & Public Rights-of-Way Management
Telephone companies, cable operators, and broadband providers have occupied public rights-of-way for decades, stringing lines on utility poles, boring conduit under streets, and installing equipment on public roads under legal frameworks that predate the modern telecommunications industry. Managing that occupation is one of the most persistent and underappreciated challenges in local government. The infrastructure is aging, the legal frameworks governing it are complex and frequently misunderstood, and the physical consequences of inadequate oversight such as deteriorating aerial plant, sunken pavement, collapsing trenches fall directly on the municipality and its residents.
Coastal Tower Law helps cities and counties understand and exercise their authority over wireline infrastructure in the public rights-of-way, ensuring that providers comply with their legal obligations and that the municipality’s long-term infrastructure and public safety interests are protected.
The Legal Framework
Local authority over wireline infrastructure in the public right-of-way is shaped by an overlapping set of federal, state, and regulatory requirements. At the federal level, 47 U.S.C. Section 253 prohibits local governments from imposing requirements that effectively prohibit the provision of telecommunications services, while preserving the right to manage the public right-of-way on a competitively neutral and nondiscriminatory basis.
California Public Utilities Code Sections 7901 and 7901.1 grant telephone corporations the right to use public rights-of-way for their infrastructure, while preserving municipal authority to exercise reasonable control over the time, place, and manner of that use. Together, these frameworks give municipalities more tools than they often realize, but exercising those tools effectively requires knowing precisely where each applies.
Managing Wireline Encroachments in the Public Right-of-Way
Underground and aerial wireline deployments each create distinct long-term obligations for providers and municipalities alike. Underground installations, direct-buried cable, conduit systems, junction boxes, and vaults disturb compacted soil and road base in ways that cause ongoing settlement and pavement degradation long after construction is complete. Trench lines that were improperly restored at the time of installation can sink, crack, and fail over years as disturbed material continues to settle, creating road hazards and pavement maintenance costs that municipalities absorb without recourse unless their encroachment permits and license agreements clearly address them. Microtrenching, a deployment method in which providers cut a narrow, shallow slot in existing pavement to lay fiber, and which local governments may have to allow under certain circumstances, poses particular long-term risks to pavement integrity and requires permit conditions that address trench depth, seal specifications, and the municipality’s right to require full pavement restoration if the installation fails prematurely.
Aerial plant attached to utility poles presents a different and often more visible set of challenges. Aging and deteriorating wood poles that have exceeded their service life, structural overloading from successive attachments by multiple providers, the fire risk posed by overloaded or failing poles in dry climates, and the proliferation of temporary “buddy” poles installed to support poles that should have been replaced but never were, leave neighborhoods with redundant, cluttered, and hazardous infrastructure with no clear path to remediation. Public works departments reviewing encroachment permits for new attachments need the legal tools and technical standards to evaluate whether an existing pole can safely accommodate additional loading, to condition or deny permits where structural capacity is inadequate, and to require remediation of unsafe conditions as a prerequisite to approval.
We help local governments address these issues through:
- Developing encroachment permit policies for wireline facilities in the public rights-of-way, including application requirements, engineering review standards, construction specifications, and enforcement mechanisms for non-compliant installations
- Encroachment permit conditions that protect long term interests and concerns, not just short term ones during the construction period
- Provisions requiring providers to repair or reimburse the municipality for pavement failures attributable to their installations
- Requirements for as-built documentation and GIS-compatible infrastructure mapping to support ongoing right-of-way management
Contact Coastal Tower Law to discuss how your municipality can better manage wireline infrastructure in the public right-of-way and protect the long-term condition of your streets and public assets.